Part of our Complete Guide to Owner Builder Kit Homes

In 2026 you need owner builder approval in Victoria for work over $20,000, in NSW over $10,000, in Queensland over $11,000 (incl. GST), in Western Australia over $20,000 and in the Northern Territory over $25,000; Tasmania and the ACT license owner builders without a dollar threshold, and South Australia has no owner builder permit at all. Every figure below is taken from the state regulator’s own page, which is linked so you can check it before you apply.

Owner builder licensing requirements by state at a glance

State When you need approval Training Issued by Limit on repeat approvals
VIC Domestic building work over $20,000 (certificate of consent) BPC assessment of knowledge Building and Plumbing Commission (BPC) Once every 5 years (exceptions apply)
NSW Work over $10,000 on your own home Approved education for work of $20,000 or more NSW Fair Trading (Service NSW) One permit in any 5-year period
QLD Work over $11,000 incl. GST QBCC-approved course Queensland Building and Construction Commission (QBCC) One permit every 6 years
WA Work over $20,000 that needs a building permit ($50,000 for Class 10a sheds, carports, garages) WA-specific owner builder training in the last 24 months (or a WA building registration) plus a white card Building and Energy (LGIRS) Wait 6 years from the building permit
TAS Owner building work that needs a building permit Approved course in the last 12 months plus a white card Consumer, Building and Occupational Services (CBOS) Limited number of Class 1a projects per 10 years
ACT Owner builder work under a building approval (Class 1, 2 or 10a) Owner builder course in the last 5 years (or an ACT builder licence) plus a white card ACT construction occupations licensing Check with the regulator
SA No owner builder permit None required Council or private certifier (development approval) Not applicable
NT Building or extending a home where the work is over $25,000 Read the owner builder manual and sign its declaration Building Practitioners Board Wait 6 years before another property

Owner builder approval is never the building permit itself. Every state still needs the normal building approval (and planning approval where your zone or overlays call for it) before work starts.


Victoria (VIC)

  • When you need it: a certificate of consent is required for domestic building work on land you own when the value of the work is more than $20,000 (raised from $16,000 on 1 July 2026).
  • Training: the BPC uses an assessment of knowledge so you understand your duties and insurance obligations.
  • Issued by: the Building and Plumbing Commission (formerly the VBA).
  • Repeat limit: once every five years for more than one home, with exceptions for extensions to the same home or a small second dwelling.
  • Selling: the BPC will not issue a certificate if you have contracted to sell an owner-built home without the required insurance.

New South Wales (NSW)

  • When you need it: owner builder work worth more than $10,000 on your own home, unless a licensed builder is contracted to supervise. Value means the reasonable market cost of labour and materials.
  • Training: for work of $20,000 or more you must complete the approved owner builder education (or equivalent).
  • Repeat limit: only one owner builder permit can be issued in any five-year period, except for the same land or special circumstances.
  • Source: NSW Government: when an owner-builder permit is needed.

Queensland (QLD)

  • When you need it: an owner builder permit from the QBCC for work valued over $11,000 including GST.
  • Training: a QBCC-approved owner builder course.
  • Repeat limit: one owner builder permit every six years.
  • Still needed: building approval from a building certifier, and plumbing approval from council where plumbing work is involved.
  • Source: QBCC.

Western Australia (WA)

  • When you need it: owner-builder approval when a building permit is required and the work is estimated at over $20,000, or over $50,000 for Class 10a buildings such as sheds, carports and private garages.
  • Training: owner-builder training with WA-specific content in the previous 24 months, or a current or previous WA building practitioner, architect, building surveyor or building engineer registration. At least one applicant needs a construction induction (white or blue) card.
  • Repeat limit: wait six years from the date the building permit was issued before applying again (waivable for hardship or the same land).
  • Selling: you remain responsible for at least seven years, and selling an owner-built dwelling within seven years without home indemnity insurance is an offence.
  • Source: WA Government: owner-builder approval.

Tasmania (TAS)

  • When you need it: an owner builder permit from CBOS before owner building work that needs a building permit.
  • Training: an approved owner builder course completed in the last 12 months, plus a white card.
  • Insurance: public liability cover (CBOS asks for $5 million).
  • Fee: $470.40 for 2026-27 (ABLIS).
  • Source: CBOS Tasmania.

Australian Capital Territory (ACT)

  • When you need it: an owner-builder licence to do owner builder work under a building approval on Class 1, Class 2 or Class 10a buildings. There is no dollar threshold.
  • Training: an owner builder course completed within the last five years, or an active ACT class A, B or C builder licence, plus construction induction training.
  • Timing: assessment takes at least four weeks and is not fast tracked.
  • Source: ACT Planning: owner-builder licence.

South Australia (SA)

  • Permit: SA has no owner builder permit or licence. You lodge for development approval through PlanSA (council or private certifier) like any other applicant.
  • Sign-off: where development approval is needed, a registered building work supervisor or private certifier usually signs Part A of the Statement of Compliance and the owner signs Part B.
  • Insurance: since 10 November 2025, building indemnity insurance is required for domestic building work valued at $20,000 or more (previously $12,000). As an owner builder you need an insurance certificate from each licensed contractor whose work is $20,000 or more; insurance is not required for work you do yourself (PlanSA Advisory Notice Building 03/25).
  • Source: Barossa Council owner and builder information (approvals and sign-off); PlanSA for the insurance threshold.

Northern Territory (NT)

  • When you need it: an owner builder certificate to build or extend a home when the work is valued above $25,000.
  • Training: no course; you read the owner builder manual and sign its declaration.
  • Limits: one certificate at a time, covering one parcel of land for three years (renewable once), and a six-year wait before applying for another property.
  • If you sell: you remain responsible for rectifying defective work for up to six years.
  • Check the figure: the NT Government and Building Practitioners Board pages give $25,000 (checked 5 November 2026), although some older guides and an older NT Government page still show $12,000.
  • Still needed: a building permit and a fidelity fund certificate before construction starts.
  • Source: NT Government: get an owner builder certificate.

What owner building a kit home involves

A BRIbuild steel frame kit is structure only: the steel subfloor, wall frames, roof trusses and engineering. As the owner builder you organise the slab or footings, roofing, cladding, windows, doors, insulation, linings and the licensed trades. We assist you with drafting, council planning and DA, and building permits. To see what a structure-only kit costs, browse the Kit Home Floor Plans catalogue, which publishes a from price for every design, or read BRIbuild’s owner builder kit home guide.

Common Questions

Do I need an owner builder permit for a kit home?

Usually, yes. A kit home is a dwelling, so in VIC, NSW, QLD, WA and NT you need owner builder approval once the work passes the state threshold, and in TAS and the ACT you need the permit or licence for owner building under a building approval. South Australia is the exception: there is no owner builder permit there.

What is the owner builder threshold in Victoria in 2026?

$20,000. From 1 July 2026 the Building and Plumbing Commission requires a certificate of consent for domestic building work on land you own when the value of the work is more than $20,000. The old $16,000 figure no longer applies.

Can I build investment properties as an owner builder?

The schemes are designed for people building their own home, and each state limits how often you can use them (five years in VIC and NSW, six years in QLD, WA and the NT). Check the regulator’s eligibility rules before buying land for an owner-built investment.

How long does the owner builder course take?

Course length depends on the provider and state. NSW, QLD, WA, TAS and the ACT require approved training; VIC uses the BPC’s assessment of knowledge; SA and the NT have no course.

Can I sell an owner-built home?

Yes, but insurance rules apply. In WA, for example, selling within seven years without home indemnity insurance is an offence, and in Victoria the BPC will not issue a new certificate if you sold without the required insurance. Check your state’s rules before you list.


Next Steps

Call 1300 866 131
Send Us Your Plans →
Browse Floor Plans →

Thanks! We'll be in touch soon.